Overview
Location
Eastern Athabasca Basin, Saskatchewan, Canada
Ownership
100% IsoEnergy
Deposit Type
Unconformity related sandstone and basement hosted uranium
Stage
Exploration
Primary Minerals
Uranium
A program of 12,694m in 30 drill holes was completed in November 2021. The drilling campaign had three main objectives: expansion of Hurricane zone, infill drill to test the continuity of the high-grade mineralization, and exploration of areas east of Hurricane. Drilling intersected mineralization in several holes, including:
- LE21-107: 6.5m @ 20.4 U3O8, including 3.5m @ 34.5% U3O8.
- LE21-78C1: 12m @ 5.2 U3O8, including 2.0m @ 27.6% U3O8.
- LE21-87A: 7.5m @ 4.5 U3O8, including 2.0m @ 9.2% U3O8.